What we do
Block paving
Classic look, huge choice of colours and patterns, and individual blocks can be lifted and relaid if you ever need to reach a pipe.
Gravel & grid
Cost-effective and right for rural properties. Laid on a stabilising grid so it doesn't rut or migrate.
Permeable & SuDS-compliant
Surfaces and drainage designed to meet the front-garden rules without needing planning permission.
Dropped kerbs
We advise on whether you need a vehicle crossing and manage the application to your local highways authority and the approved-contractor work.
Edging, borders & lighting
Setts, kerbs, contrasting borders and low-voltage lighting to finish it off.
How we build it
- Site visitWe check levels, where water drains now, access, and whether a dropped kerb or planning consent is needed.
- ExcavationDig out to depth — typically 250–300 mm — and remove the spoil. No laying over failed surfaces.
- Sub-baseAt least 150 mm of compacted MOT Type 1 on a membrane. This is what stops tyre ruts and sinking.
- SurfaceBlocks laid on screeded sharp sand and vibrated in; resin-bound on a new open-graded tarmac base; gravel on grid.
- Drainage & finishChannel drains or a soakaway where needed, edges haunched in concrete, kiln-dried sand or sealing, then a full clean-up.
Your options
| Block paving | Traditional, repairable, wide price range. Needs annual weed treatment or re-sanding. |
| Resin-bound | Modern, permeable, weed-free. Higher up-front cost; needs a sound base. |
| Gravel on grid | Cheapest, permeable, suits period and rural homes. Some stone migration. |
| Permeable block | Meets drainage rules without a soakaway; slightly higher material cost. |
Where we work
We work all over Essex and London, and as far afield as Devon. Wherever you are, get in touch and we'll tell you how soon we can come and take a look.
Frequently asked questions
Do I need planning permission for a new driveway?
Not if the surface is permeable or drains to a lawn or border. Any new impermeable surface over 5 m² at the front of a house needs planning consent — we design around that rule.
Do I need a dropped kerb?
If you're creating a new driveway or widening an existing one across the pavement, yes. That's an application to your local highways authority, and the work must be done by an approved contractor. We handle it and build it into the timeline.
Can you lay resin over my old driveway?
Only if the existing surface is sound and stable. Cracked or moving concrete needs to come out or be overlaid with a new base — otherwise the cracks come straight through.
How long does a driveway take?
A typical two-car driveway is around a week from dig-out to finish. Resin-bound needs a cured base first, then the resin goes down in a day.
Thinking about a new driveway?
We'll tell you which surface suits your house, whether you need a dropped kerb, and give you an itemised quote. Free site visits across Essex, London and Devon.

