What we do
Patios & entertaining areas
Indian sandstone, porcelain, limestone and slab patios in any shape — including steps, split levels and integrated seating walls.
Pathways & side returns
Paths that drain properly, sit below your damp-proof course and don't become an ice rink in winter.
Porcelain paving
20 mm exterior porcelain laid on a primed full bed. Stain-proof, frost-proof and nearly maintenance-free.
Steps, edging & retaining
Bullnose steps, sleeper edging and small retaining walls to deal with sloping gardens.
Drainage
Channel drains, falls and soakaways sized for clay ground, so water goes where it should.
Patio restoration
Professional clean, re-joint and seal for tired patios that are structurally sound — usually done in a day.
How we build it
- Site visit & levelsWe measure, check your damp-proof course and where water currently goes, and look at access for machinery.
- ExcavationDig out to 200–250 mm, remove spoil, and lay a geotextile membrane over the clay.
- Sub-base100–150 mm of MOT Type 1 laid in layers and compacted with a plate compactor — the part that makes it last.
- LayingEvery slab on a full mortar bed with a bond bridge. Falls of about 1 in 80 away from the house.
- Jointing & finishResin or two-part jointing compound, edging finished, optional sealing, and a full clean-up.
Your options
| Indian sandstone | Natural colour variation, good value, needs sealing. The most popular choice in our area. |
| Porcelain | Higher material cost, needs a primer and full bed — but stays looking new with a hose-down. |
| Limestone / slate | Darker, more formal look. Limestone needs care with acidic cleaners. |
| Block paving | Good for curves, steps and areas that may need lifting later. |
| Concrete slabs | Budget option for utility areas and side paths. |
Where we work
We work all over Essex and London, and as far afield as Devon. Wherever you are, get in touch and we'll tell you how soon we can come and take a look.
Frequently asked questions
How long does a new patio take?
Most patios of 20–30 m² take three to five working days including excavation and sub-base. Porcelain, steps and tight access add time; we'll give you a realistic schedule with the quote.
Do I need planning permission for a patio?
Not for a rear garden patio at a normal level. Listed buildings, conservation areas and front-garden paving over 5 m² are the exceptions — we'll flag it if it applies.
Can you fix my existing patio rather than replace it?
Often, yes. If the slabs are sound and the falls are still there, a professional clean and re-joint brings it back in a day. If the base has failed we'll tell you honestly — see our guide on why patios sink on Essex clay.
What's included in the quote?
Everything: excavation, spoil removal, membrane, sub-base depth, bedding method, the exact paving product, jointing, drainage and any sealing — itemised, with a start date.
Ready for a patio that stays put?
Free site visit, itemised written quote, no pressure. We work across Essex, London and Devon.

